25.08.2010
Architects date - Our house now looks different from faaaaaar
Today we had the meeting with our architect, Mr. S. This was also time clock at 11 past and at first everything was completely straightforward, because there is no development plan for our property . But when it went to the floor plan, it turned out that we had because of the structural condition of buildings, the proposed oblique wall (see sketch in the post from 06.08.) About a meter move backward. This would be our dining room but too small and so we had to reschedule everything again. This was once a great shock to us, but when we (or rather I) had a little recovered from that, was the planning and design but still very successful and we are now with the final product more than satisfied. Also for our fire problem has now a really good solution results, which also was sanctioned immediately by phone from our chimney sweeper. Now we are eagerly awaiting the preliminary guidelines and to seeing whether we like it then still as good as today. So far, however, we are thrilled in any case!