5 years
The first anniversary of the team blogs coming.
Wednesday, December 29, 2010
Mtd 8 Hp Snowblower Change Belts
marcipanis
"The Bread of Mark" - says the "Marzipan" (marcus + panis).
This should be the future instead of the usual M. Oe bread of the poor
him serve his bread to his Herrengedeck ... Mark delicious bread with ham and egg
....
"The Bread of Mark" - says the "Marzipan" (marcus + panis).
This should be the future instead of the usual M. Oe bread of the poor
him serve his bread to his Herrengedeck ... Mark delicious bread with ham and egg
....
Friday, November 19, 2010
Take Valium Before Dentist Appointment
19.11.2010
can
can
So now are built!
We now have everything in the bag and wait only for the fact that it goes on to finger-house. The transfer of the lot is completed and the land registry changes are already registered. The applications to the utilities are all made and yesterday we had fluttered into the house, the building permit. Today we can then remove the roots from the construction industry and therefore we are well prepared for buildings. The only pity is that it still takes so long until it can finally go. The sampling has unfortunately come into effect until early February. Would give me if it had not worked out before Christmas!
Thursday, November 18, 2010
Thursday, November 11, 2010
Making Walking Sticks With Rams Horn
11.11.2010
Perceived standstill
the moment we are somehow not motivated particularly to plan things for our house and organize, as we have recently learned that the sampling date will always be until early February (correcting date then in the week 30.05 -. 03.06)..
The applications for the utilities are now all but on the way and I hope that the building permit in the next few days to be found in our mailbox.
To the roots on our property, we must take care also the end of this month, but it looks like we'll have this strong support.
Perceived standstill
the moment we are somehow not motivated particularly to plan things for our house and organize, as we have recently learned that the sampling date will always be until early February (correcting date then in the week 30.05 -. 03.06)..
The applications for the utilities are now all but on the way and I hope that the building permit in the next few days to be found in our mailbox.
To the roots on our property, we must take care also the end of this month, but it looks like we'll have this strong support.
Tuesday, November 9, 2010
Sleepy Time Tea Breastfeeding
It is taking shape ...
Our parquet layers in olympia mature form. Yesterday was ready not only the dressing room, but also the entire living room. Tonight, were then already all skirtings cut and assembled. Tomorrow comes the stairs and then the "initial treatment" (?)...
After yesterday we were somewhat surprised that the few visible progress, has now done a lot. On the upper floor are now at least most walls provided with painter fleece. But there are still a lot to do until we can move.
Oh, and on Monday are our garbage cans come. The gray-60l barrel is really cute. Well, yes it is emptied weekly.
Our parquet layers in olympia mature form. Yesterday was ready not only the dressing room, but also the entire living room. Tonight, were then already all skirtings cut and assembled. Tomorrow comes the stairs and then the "initial treatment" (?)...
After yesterday we were somewhat surprised that the few visible progress, has now done a lot. On the upper floor are now at least most walls provided with painter fleece. But there are still a lot to do until we can move.
Oh, and on Monday are our garbage cans come. The gray-60l barrel is really cute. Well, yes it is emptied weekly.
Sunday, November 7, 2010
Shuffleboard Measures
What a parquet ...
Today we marvel at not only our beautiful parquet . (The publisher is yesterday pretty much come - gamer room, loft and bedrooms)
we have today with the server rack and the headquarters of our Homematic plant in operation taken.
The result was quite good - 27 actuators were found - not five. Why is it at the 5, we need to find out more. Furthermore, we have assembled the entire window contacts - on the set of windows a real task.
yet there are still some minor problems of electrical and dusk with motion sensors. But we will surely in time under control.
Next week it goes with parquet & Decorators further right. Both want to (&) must be completed in a week. As we are sure one or the other photo was ongoing.
Today we marvel at not only our beautiful parquet . (The publisher is yesterday pretty much come - gamer room, loft and bedrooms)
we have today with the server rack and the headquarters of our Homematic plant in operation taken.
The result was quite good - 27 actuators were found - not five. Why is it at the 5, we need to find out more. Furthermore, we have assembled the entire window contacts - on the set of windows a real task.
yet there are still some minor problems of electrical and dusk with motion sensors. But we will surely in time under control.
Next week it goes with parquet & Decorators further right. Both want to (&) must be completed in a week. As we are sure one or the other photo was ongoing.
Saturday, November 6, 2010
Do Women Tattoo Their Genitals
day 2 post Viebrock
Today we were busy again.
The bathroom furniture we bought today - it's a combination of oak Sanipa 2day dark.
Then we discussed with the Gala Bauer our other ideas regarding paving, fencing and garden ... We are curious what all this will cost. ;-)
the House of parquet layer was active. The result comes in the picture just does not advantage. It really looks wonderful.
Today we were busy again.
The bathroom furniture we bought today - it's a combination of oak Sanipa 2day dark.
Then we discussed with the Gala Bauer our other ideas regarding paving, fencing and garden ... We are curious what all this will cost. ;-)
the House of parquet layer was active. The result comes in the picture just does not advantage. It really looks wonderful.
|
| primed smooth floor in the living room |
|
| First floor - in Gäste-/Spielzimmer |
Friday, November 5, 2010
Goldwell Hair Colour Removal
Day 1 after final acceptance
began with the call of a craftsman, that there would be several insurmountable problems at the construction site. Wow! This is indeed going well on day 1 after Viebrock. Fortunately
turned out that these problems was easy to explain in a brief conversation with stakeholders. Fine.
There is a lot going on with us.
The
parquet layers today, as planned begun, and already primed all areas. Very fast! Tomorrow, he will then probably start with the stairs "visible".
The painter has closed include all (and there were many) holes in unused electrical outlets and loft a few passages be plastered. This room is the first truly finished room. Cool.
The Electricians today made his first things done. I now had to reorder some actors first - then this trade is completed next week.
began with the call of a craftsman, that there would be several insurmountable problems at the construction site. Wow! This is indeed going well on day 1 after Viebrock. Fortunately
turned out that these problems was easy to explain in a brief conversation with stakeholders. Fine.
There is a lot going on with us.
The
parquet layers today, as planned begun, and already primed all areas. Very fast! Tomorrow, he will then probably start with the stairs "visible".
The painter has closed include all (and there were many) holes in unused electrical outlets and loft a few passages be plastered. This room is the first truly finished room. Cool.
The Electricians today made his first things done. I now had to reorder some actors first - then this trade is completed next week.
|
| Our house number is now also been installed! |
Thursday, November 4, 2010
Beagle Cairn Terrier Mix
Today it was finally over. The final was today. The
ran off, as always, very relaxed and friendly. There was also nothing to discuss. The open points of the pre-acceptance were either completed or will be corrected by the painter.
There were only 2 points that need to be made: first
A window has scratches - is replaced
second The gap between G-WC and cloakroom is wrong - is still done
Otherwise, the second Folder with all information, warranties and confirmations, and a magnum of champagne delivered. Also of course we had concern for our construction manager a trifle.
At this point we our very sincere thanks to
Mr Biesen - without which the house would probably never come true
Mrs. Ehlen - which has solved our Annoyances from architects time with charm and expertise sovereign
Mr Löhden - our construction manager, who are always very helpful, friendly and competent by very nuisance-free construction has maneuvered.
(last but not least) ... the trades, especially the Masons, the various squads Wendt, the sealer, the plasterers and so on ... who were all really great!
This is, of course, this blog has not been entirely his .
Currently there again very busy in the house. The painter is at work today and the whole house into a sauna. From tomorrow comes to the parquet layers and the (new) electrician, his work is still . Complete
far everything seems on track to be. End of next week, all three are finished - if nothing unforeseen happens. On 15 then the new parts of the kitchen delivered and our telephone / DSL port enabled (before he is then ported to 1 & 1). Tue / Wed we move then. Let's see if everything works out as planned. In between is also the fireplace be mounted ...
Oh, and our new Side-by-Side Refrigerator that we have today acquired in Magdeburg is, hopefully in good time.
Here is a picture of our garage front. The straps make it a great - positive - difference. At the top of the edge comes a zinc-edge ...
Even a quick look at the wildlife of our new home. ;-)
Wednesday, November 3, 2010
Spacewalker Mv42v1.3 Specifications
61st Construction day
Well, that's not quite so yes. We have moved the final by a few days back, because scheduling is suited us ... were but a few things to take care of it too.
What has happened since the last entry?
The straps on the garage front, were today (or was it yesterday?) Grouted and still sealed. Looks great - a picture we supply to more.
Today was our " new " Electricians here, and has made visual / aesthetic corrections (grouping of switches to double switches, etc.), and 3 / 4 of our Homematic done installation. Were Much to our satisfaction. In different rooms replaced the switches to switch and the respective actuators mounted behind it. All buttons work. Whether the work HM actuators, however, we will only learn after moving if the unit is installed.
The construction manager from the company floor tonight was also there and a 2nd CM-measurement was made. Hurray, we have achieved the necessary 1.8%. On Friday put the gentlemen go already filling. Over Next week will be the topic probably just concluded as planned.
The painter has not really moved yet. :-( From his plan before the floor to be finished in order to save the masking is probably nothing. ... Hmm
regarding
. our bathroom furniture we decided to Sanipa. Now we have only one artisans find us the parts concerned, and this year, mounted. This is not as easy as it sounds. As we have in the coming days some dates in this matter.
Then we are in the planning regarding paving and fencing it. Let's see when we come there to offer and execution. We have also done like in 2010.
Last but not least we still drives the desire for a new refrigerator by electronics stores and online stores. The comes from SAMSUNG - which has built the outstanding refrigerators including an expert on the matter by telling us a long time ago. ;-)
until it moved but that will probably not work out.
DC I have to fire our bauer send an info, installed so that possibly the fire until the river ... na see.
Well, that's not quite so yes. We have moved the final by a few days back, because scheduling is suited us ... were but a few things to take care of it too.
What has happened since the last entry?
The straps on the garage front, were today (or was it yesterday?) Grouted and still sealed. Looks great - a picture we supply to more.
Today was our " new " Electricians here, and has made visual / aesthetic corrections (grouping of switches to double switches, etc.), and 3 / 4 of our Homematic done installation. Were Much to our satisfaction. In different rooms replaced the switches to switch and the respective actuators mounted behind it. All buttons work. Whether the work HM actuators, however, we will only learn after moving if the unit is installed.
The construction manager from the company floor tonight was also there and a 2nd CM-measurement was made. Hurray, we have achieved the necessary 1.8%. On Friday put the gentlemen go already filling. Over Next week will be the topic probably just concluded as planned.
The painter has not really moved yet. :-( From his plan before the floor to be finished in order to save the masking is probably nothing. ... Hmm
regarding
. our bathroom furniture we decided to Sanipa. Now we have only one artisans find us the parts concerned, and this year, mounted. This is not as easy as it sounds. As we have in the coming days some dates in this matter.
Then we are in the planning regarding paving and fencing it. Let's see when we come there to offer and execution. We have also done like in 2010.
Last but not least we still drives the desire for a new refrigerator by electronics stores and online stores. The comes from SAMSUNG - which has built the outstanding refrigerators including an expert on the matter by telling us a long time ago. ;-)
until it moved but that will probably not work out.
DC I have to fire our bauer send an info, installed so that possibly the fire until the river ... na see.
Thursday, October 28, 2010
How Much Does It Cost For Alcohol Poisoning
57th Construction day (loft)
main event of the day the completion of the "Blue Room". It's been wonderful. ;-)))
now expected, the temperature fluctuations up there something to be mitigated.
Unfortunately I made a picture from the window. This fact has been framed very nicely. I ran after. The guys from Wendt have once again great job. This was all cleaned up and swept, is there already almost taken for granted. (Unfortunately the light was tempered ...)
to yesterday's events:
landscaping - we are excited about the offer ...
heating instruction - good Goodness. That was beyond my capacity at some point. 30 minutes pure information. Please let the part run automatically ...
parquet layers - who took care of some disappointment. No, it was not because of him. Quite the contrary. But the ground is at 2.4% CM clearly too wet. We have to make a new measurement next week. The heating program of the FBH is now back in full swing (and our electricity meters also ...). Then, still found that the door frames are much too high (7-8mm). :-( Hopefully Viebrock gets the further correction. Especially in transition tile to hardwood floor is likely to be difficult. Because we are a bit nervous about whether there is a happy end.
Electrical - in terms of home automation is now awarded the contract and ordered all -> it is the budget version: HOME MATIC . We are curious how it will work. On
8.11. but at least now we get our garbage cans. That's also what.
Now we hope mainly that the artist gets going ... (Our wallpaper is in fact arrived)
main event of the day the completion of the "Blue Room". It's been wonderful. ;-)))
now expected, the temperature fluctuations up there something to be mitigated.
Unfortunately I made a picture from the window. This fact has been framed very nicely. I ran after. The guys from Wendt have once again great job. This was all cleaned up and swept, is there already almost taken for granted. (Unfortunately the light was tempered ...)
to yesterday's events:
landscaping - we are excited about the offer ...
heating instruction - good Goodness. That was beyond my capacity at some point. 30 minutes pure information. Please let the part run automatically ...
parquet layers - who took care of some disappointment. No, it was not because of him. Quite the contrary. But the ground is at 2.4% CM clearly too wet. We have to make a new measurement next week. The heating program of the FBH is now back in full swing (and our electricity meters also ...). Then, still found that the door frames are much too high (7-8mm). :-( Hopefully Viebrock gets the further correction. Especially in transition tile to hardwood floor is likely to be difficult. Because we are a bit nervous about whether there is a happy end.
Electrical - in terms of home automation is now awarded the contract and ordered all -> it is the budget version: HOME MATIC . We are curious how it will work. On
8.11. but at least now we get our garbage cans. That's also what.
Now we hope mainly that the artist gets going ... (Our wallpaper is in fact arrived)
Tuesday, October 26, 2010
Buy Glucocimine In India
55th Construction day (preliminary acceptance)
Today was the pre-acceptance . Everything went smoothly; really like the "normal" BL-call each week.
course, there were a few points. All just little things that probably no problem to the final inspection at 1.11. (For us was moved to the back) will be done.
example, there were a few small cracks in the plaster, a Katsche in the country, sitting crooked exhaust pipe, etc. In addition, the
sealer was in and around the house go. Specifically, the joint super-class from the outside see n - which are indistinguishable from the mortar-joints. Perfect!
was also now the final electrical instead. Also ran without problems - 2 insignificant details were still open.
came to top it all a Lord of Glamü and measured, the shower. Very encouraging was that the glass walls not 7-8 weeks delivery time as Wendt specified, but only have 3 weeks. Phew. So the issue deserves to be done soon after our arrival.
Oh yes, MEDA was also the delivery of our kitchen nteile fixed. They come a day before our move. Wonderful. Fortunately, today was
swept our house by Viebrock and the tiles and windows (including frame) but were cleaned thoroughly. Super service! The difference to before is clearly visible. A fine thing. ;-)
morning are several important dates: 1st
Meeting with a builder regarding outdoor gala planning
second Heating training
third CM measurement of the floor through the fourth floor Leger
Meeting with a new electrician regarding home automation
Everything in the half-hour in the evening ....
Today was the pre-acceptance . Everything went smoothly; really like the "normal" BL-call each week.
course, there were a few points. All just little things that probably no problem to the final inspection at 1.11. (For us was moved to the back) will be done.
example, there were a few small cracks in the plaster, a Katsche in the country, sitting crooked exhaust pipe, etc. In addition, the
sealer was in and around the house go. Specifically, the joint super-class from the outside see n - which are indistinguishable from the mortar-joints. Perfect!
was also now the final electrical instead. Also ran without problems - 2 insignificant details were still open.
came to top it all a Lord of Glamü and measured, the shower. Very encouraging was that the glass walls not 7-8 weeks delivery time as Wendt specified, but only have 3 weeks. Phew. So the issue deserves to be done soon after our arrival.
Oh yes, MEDA was also the delivery of our kitchen nteile fixed. They come a day before our move. Wonderful. Fortunately, today was
swept our house by Viebrock and the tiles and windows (including frame) but were cleaned thoroughly. Super service! The difference to before is clearly visible. A fine thing. ;-)
morning are several important dates: 1st
Meeting with a builder regarding outdoor gala planning
second Heating training
third CM measurement of the floor through the fourth floor Leger
Meeting with a new electrician regarding home automation
Everything in the half-hour in the evening ....
Monday, October 25, 2010
Chicken Broth In A Can Expired?
54th Construction day (blower door test)
Today was the blower door test done ...... and of course passed. ;-)
The masons our future home have also visited, while the garage door with "strap" provided. Still it looks a little funny, because the joints were not made and seems to match the white garage wall.
We eagerly toward the completion of this already and are in terrible stress with respect to wallpaper, paint, window "blinds", planning the outdoor facilities, etc.
this wallpaper, we have ordered for the bedroom:
wallpaper VI probably not give it - instead, we will "colorize" the painter fleece ...
Today was the blower door test done ...... and of course passed. ;-)
The masons our future home have also visited, while the garage door with "strap" provided. Still it looks a little funny, because the joints were not made and seems to match the white garage wall.
We eagerly toward the completion of this already and are in terrible stress with respect to wallpaper, paint, window "blinds", planning the outdoor facilities, etc.
this wallpaper, we have ordered for the bedroom:
|
| Hermitage is more Satin AS Creation |
Sunday, October 24, 2010
Chelsea Charm At Home
24.10.2010
We have a new kitchen!
My father had announced some time ago to try to fund our kitchen. On Tuesday I talked to him and him from the previous planning status reports. He was of the opinion that it would then now is the time to go to several furniture stores in order to obtain offers. On Saturday, we wanted to start again with it, as we present the installation plans even to the sampling should have. Well, compare the prices never happened, because in the first store they made my father for him apparently quite acceptable offer, so that he signed the contract directly. After that we enjoyed even at the expense of the store for lunch and a toast to the new kitchen. At least we have you ever have one less worry, even if our beautiful kitchen coupon not now but will be used. Now we are just waiting for the sampling date!
When it comes to property we were not idle in our holiday, even though we are not able to come this far in advance as intended. But those who have the Raspberry bushes can remember, I would say, that they belong to the past since Wednesday. Stephan has toiled pretty hard to rauszubekommen out the bushes and the cast (!) Trellis. Now have "only" the tree roots, the currants and raisins out, and then the civil contractors come to the excavation!
We have a new kitchen!
My father had announced some time ago to try to fund our kitchen. On Tuesday I talked to him and him from the previous planning status reports. He was of the opinion that it would then now is the time to go to several furniture stores in order to obtain offers. On Saturday, we wanted to start again with it, as we present the installation plans even to the sampling should have. Well, compare the prices never happened, because in the first store they made my father for him apparently quite acceptable offer, so that he signed the contract directly. After that we enjoyed even at the expense of the store for lunch and a toast to the new kitchen. At least we have you ever have one less worry, even if our beautiful kitchen coupon not now but will be used. Now we are just waiting for the sampling date!
When it comes to property we were not idle in our holiday, even though we are not able to come this far in advance as intended. But those who have the Raspberry bushes can remember, I would say, that they belong to the past since Wednesday. Stephan has toiled pretty hard to rauszubekommen out the bushes and the cast (!) Trellis. Now have "only" the tree roots, the currants and raisins out, and then the civil contractors come to the excavation!
Thursday, October 21, 2010
Pokemon Silver And Gold For Mac
51st Construction day (Plumbing done)
Today, the farmer heating and plumbing total finished.
We revel in the corresponding visual delight of our valves. ;-)))
But see yourself ..
We are always more on the completion of construction and our catchment. * Hop *
Otherwise, nor were the lack of French balconies on the west side delivered and installed. The also look great.
Otherwise, today was the owner in EL on the move:
The boxes in Terminal cinema room were connected and mounted.
How you go see it step by step towards completion.
The Electricians must still complete his stuff - but even that will slowly become less. The sealer
must accomplish his work, and then there are some little things ...
morning, I can bring back the inner tube. ;-)
The Baustromkasten was already last week reduced.
I was so slow even order garbage cans ... * Node *
ear (so slow getting serious ...)
Today, the farmer heating and plumbing total finished.
We revel in the corresponding visual delight of our valves. ;-)))
But see yourself ..
|
| here only has the keeper for you mounted hand shower ... |
|
| submerged thermostat |
|
| The Construction Project Owner pride ;-)) |
|
| the "soft closing" has to be cool ... |
Otherwise, nor were the lack of French balconies on the west side delivered and installed. The also look great.
Otherwise, today was the owner in EL on the move:
The boxes in Terminal cinema room were connected and mounted.
How you go see it step by step towards completion.
The Electricians must still complete his stuff - but even that will slowly become less. The sealer
must accomplish his work, and then there are some little things ...
morning, I can bring back the inner tube. ;-)
The Baustromkasten was already last week reduced.
I was so slow even order garbage cans ... * Node *
ear (so slow getting serious ...)
Wednesday, October 20, 2010
Improve fm Transmitter
50th Construction day
"tiles ready!"
describes the construction day today's probably accurate.
The bathroom tiles were the last things today. Everything looks perfect. The broken tile on the tub, of course, was also renewed.
We are excited about what Thu & Fri yet happened. Because we want to take place Monday, the pre-acceptance.
"tiles ready!"
describes the construction day today's probably accurate.
The bathroom tiles were the last things today. Everything looks perfect. The broken tile on the tub, of course, was also renewed.
We are excited about what Thu & Fri yet happened. Because we want to take place Monday, the pre-acceptance.