was carried out yesterday in our house, the differential pressure-measuring methods.
Anglicisms lovers call it blower-door test. The tightness of the house will be checked and leakages in the building envelope are to be tracked through the process.
We have a value of 0.96. For detailed explanations, I recommend Wikipedia.
The guest bathroom now works even on Saturday and is the plumbing and heating complex completed. Then should work our solar water system. Today is expected to be installed the doors. By painting the walls, we are almost done and will continue over the weekend of the EC tiled floor. In the bedroom and in the study is already the parquet floor. Corridor and children are now finished.
all a great weekend.