Tuesday, October 19, 2010

How To Play Boutique Monopoly

49th Construction day (doors)

Hi, longer nothing heard / read, right?

Well, we are somewhat in the run-and-stress at the site was not sooo much going on. mounted

But today the doors and baseboards been. It all looks very chic. surprised at the baseboards me but the distances to wall in some places of 1-2mm. This does not look as good. I'm going to ask the BC ...



we are very satisfied with the doorknobs - especially those the bathroom / WC-G. ;-)


In Bad now the Squaro has arrived - now it can go as well.

Well, since it takes ages to arrive, the shower wall - it must be measured so first of all - we are in the shower probably have no benefit in 2010. :-(((

The shock to the building owner was as follows:

had not been "dismantled" the only fitting the quasi - also is also the cleanest cut tile that is broken * * Sniff.

Well, what is now on / off?

- The electrician has removed all but switch / plug, as not dull. But the mats are not yet delivered. The rack is still not corrected, the lights do not work outside in front of the kitchen and the bathroom are spots still do not know. -Hmpf
- The Services people have to do it very well - toilets and faucets are not hung up / connected.
- The tile in the bathroom must have ran.
- The French balconies missing rear.
- Some shutters missing the limiter, some not clean run ... interests must still be adjusted.
- The door handle of the door will come.
- The wood railing has a Macke: - /
- The Master- sealer is still and will make a perfect job (with one operand for the outer joints)
- blower door test

is with us still out:
- have with the Gala-Bauer - comes from Wednesday probably the painter and starts
- Next week, the parquet layers
- Right after the fireplace specialist
- There comes hopefully by 1 & 1 in the corridors
we discuss the steps outside
The patch would please us very good front ...
- garbage cans must be ordered (so far the city has not responded to my emails)
- The will loft insulation needs - here I still hope to our BL (Help!)
- We must make further choose wallpaper in the bedroom ...
This should (in our opinion) a beautiful ornate, dark
, wrought iron bed fit

Next Week is preliminary and final inspection. Since VB has a lot to be done before, but it works already. On 16./17.11. we want to move - this all looks very good. ;-)