61st Construction day
Well, that's not quite so yes. We have moved the final by a few days back, because scheduling is suited us ... were but a few things to take care of it too.
What has happened since the last entry?
The straps on the garage front, were today (or was it yesterday?) Grouted and still sealed. Looks great - a picture we supply to more.
Today was our " new " Electricians here, and has made visual / aesthetic corrections (grouping of switches to double switches, etc.), and 3 / 4 of our Homematic done installation. Were Much to our satisfaction. In different rooms replaced the switches to switch and the respective actuators mounted behind it. All buttons work. Whether the work HM actuators, however, we will only learn after moving if the unit is installed.
The construction manager from the company floor tonight was also there and a 2nd CM-measurement was made. Hurray, we have achieved the necessary 1.8%. On Friday put the gentlemen go already filling. Over Next week will be the topic probably just concluded as planned.
The painter has not really moved yet. :-( From his plan before the floor to be finished in order to save the masking is probably nothing. ... Hmm
regarding
. our bathroom furniture we decided to Sanipa. Now we have only one artisans find us the parts concerned, and this year, mounted. This is not as easy as it sounds. As we have in the coming days some dates in this matter.
Then we are in the planning regarding paving and fencing it. Let's see when we come there to offer and execution. We have also done like in 2010.
Last but not least we still drives the desire for a new refrigerator by electronics stores and online stores. The comes from SAMSUNG - which has built the outstanding refrigerators including an expert on the matter by telling us a long time ago. ;-)
until it moved but that will probably not work out.
DC I have to fire our bauer send an info, installed so that possibly the fire until the river ... na see.
0 comments:
Post a Comment