sampling - Day 2

the evening of the second sampling day I was just still glad to finally get into bed and had no energy left for an entry into the building blog.

shy but I get this way by:
So, the second day of sampling was much more enjoyable than the first and we took a very positive feeling home. After viewing the 3D view of our bathroom, we have decided to tile the guest bathroom also high on the walls 1.60m leave. When drawing the objects Mr. E. is also noticed that our selected basin is so broad that we would have problems with opening the door. As Stephan sink but this would have necessarily (I was after all, the sink search for in the upper bathroom!), we decided summarily in favor of subsuming the door to the outside.
went
Next to it then the cost estimate, which would cost us the tiles of our Wohn-/Ess-Bereichs at additional cost. The kitchen and the hallway were indeed included in the price, since his entrance, cooking, food and housing, as an open area, we also wanted the floor everywhere are the same. The surcharge was to us but clearly too high and we have decided to abzubemustern the tiles in hallway and kitchen.

The so money saved we could then invest the same in a home-Way system. We were always in front, with several rooms in the house Internet, Cable connection and alternatively with a satellite antenna and so endow us with this solution came in handy, especially since they are much nicer and only slightly more expensive design than what we had thought about in advance.

Because of our good planning was the Drawing of sockets and light switches instead of relatively appropriated. All (and I mean all) of our friends had advised us in advance to schedule plenty definitely sockets ("Better a socket too much than too little), but we found the equipment of finger house for us actually have enough and aufbemustert Küchen-/Wohn-/Ess-Bereich only in the two sockets. The regular Read the other building blog, we have also come up with the idea to let us put power to the outside. Since Mr. E. but we could not name a price for the house through and the laying of underground cables and we are very reluctant to get involved incalculable cost, we have chosen to aufzubemustern and outdoors, two other outlets.

After we had all chosen and placed, it was because the entire sampling protocol, including detailed sketches again and go through all to sign. When we finally were ready with everything, it was now 17.00 clock and we had two hours drive home ahead of us.

At home we have but then again to the computer set and ordered our stove (Olsberg Palena Compact). Actually, we would have liked this also available from finger house, but the offer that could make us Mr. E, was close to 500 € on the recommended retail price of the manufacturer and the Internet, we have even got him again € 350 cheaper!

Finally, once on photos:
have in several other building blog we found many photos of the sampled objects. Of course, I'm starting during the sampling run around busy with the digicam and have of all that we have chosen us, took pictures. This would stop here but go beyond the scope, so we have decided against it. We show you prefer after pictures of the finished house!