Monday, January 31, 2011

Heart Catheritization Lump Closure

31.01.2011

sampling Day 1

After only 6 hours of sleep and an approximately 2-hour drive we arrived at 9.00 clock on at the company Finger house in Frankenberg. After a brief welcome and by speaking of the process, we plunged immediately searching for a wall color, roof tiles, roof beams, roof tiles etc. While this was both of us very quickly from Amsterdam, it was at the interior doors more difficult and our peak we reached after dinner when selecting the sanitaryware and wall and floor tiles. When we felt that after 2 hours finally behind We had, then came the disappointment: We did not really read the description of construction work and have forgotten that the house price is only the wall tiles of the object in the guest bathroom is included. If we want the whole (2.14 square meters!) WC is tiled up to the side walls 1,60 m, this means additional cost of 700 € for us.

was after this information, the next bad news was not long to: Our considerations for the design of the air in our controlled ventilation were found to be not feasible, which was particularly annoying because we in the run with a finger house staff had discussed using a model house.

After a long and very hard day for us but we are now sitting comfortably in the Pension Eder beach and let the day's events. Although we were convinced at the beginning of being able to live well with the standard objects, but now have additional costs arising in the five-figure range, we first have to think in peace.

All in all, the day today but was very positive and we look forward to the 3D view of our bathrooms, which we will start tomorrow morning. Now we go to bed but only once. Such a Bemusterungstag is in fact really hard!

Oh yeah, almost I had forgot:
According to current projections, our house is but already in the 20th KW, ie, in the week of 16 - 20.05.!